Burlap Lofts
Scope: Floor Technologies poured up to 3 inches of cellular concrete to level the floor to keep the weight being applied to the old subfloor down, followed by the installation of sound mat to enhance sound mitigation. Over the sound mat, Maxxon® MR was applied for reinforcement before pouring up to 1-1/2 inches of Maxxon® Gyp-Crete® 2000 Multifamily flooring.
712 Larpenteur
Contractor: West Edge Investments LLC
Scope: Floor Technologies installed Maxxon® Unglued, Maxxon® Unset and filled in gaps and cracks with Maxxon Quikfill. Then they installed Maxxon® Isolate followed by Maxxon® Level-Crete.
Lutsen Cabins
Scope: Floor Technologies had the opportunity to apply Maxxon® Commercial Pro VersaTop™ in Lutsen, MN. This new product allows your floors to have an exposed aggregate look with the durability of at least 5,000 PSI.
Red Lake Nation College
Contractor: Loeffler Construction
Scope: ½ inch of Maxxon® VersaTop™ Ground and sealed; 1-1/2 inch Maxxon® Gyp-Crete® 2000 reinforced; Acousti-Mat® ¾” Premium sound control mat.; 8” Lightweight Cellular Concrete; 6” JM Corbond III Sprayfoam
RBC Gateway Building
Contractor: Weis
Scope: 50,000 square feet of Maxxon® Acousti-Mat® 3/8 topped with a Maxxon underlayment. Covered 31st to 36th floors
A-Mill Artist Lofts
Scope: 230,500 total sq ft of Maxxon® Acousti-Mat 3/4 Premium, 21,500 sq ft Metal Decking Flutes filled in with Maxxon® Gyp-Crete® High Performance, 96,000 sq ft Polystyrene Foam installed from 1" to 8", 96,000 sq ft Moistop and Gyp-Crete 2000/3.2K at 1", 96,000 sq ft Gyp-Crete 2000/3.2K poured from 1" to 4"
Aloft Hotel
Scope: Maxxon® Gyp-Crete 2000/3.2K
Bandana Square
Scope: 29,000 sq ft of Acousti-Mat 1/4 topped with 1" to 1-1/4" Gyp-Crete 2000/3.2K, 29,000 sq ft of Gyp-Crete 2000/3.2K poured at an average of 1" to meet specified criteria
Century Plaza Building – Hennepin County
Scope: Maxxon® Gyp-Crete 2000/3.2K
Dinkydome
Scope: Maxxon® Gyp-Crete 2000/3.2K and Level-Right was used to level uneven floors
Eitel City Apartments
Scope: Maxxon® Acousti-Mat 1/4 and Gyp-Crete 2000/3.2K
Ellis Middle School
Scope: 8,200 sq. ft. of Aquafin SG3 topped with Maxxon® Gyp-Crete® High Performance ranging in depth from skim coat to 4”
Eyedeals
Scope: Maxxon® Acousti-Mat 1/4 and Gyp-Crete 2000/3.2K
H&M Store
Scope: 17,800 sq. ft. of Maxxon® Gyp-Crete® High Performance used to level the floors of two retail spaces combined into one large space
Harley Davidson – Wild Prairie
Scope: Former automotive repair facility was renovated into a retail showroom using Maxxon® Gyp-Crete 2000/3.2K and Maxxon Overlayment
Hennepin Ave.
Scope: 3/4" Gyp-Crete 2000/3.2K
Hotel Minneapolis
Scope: Maxxon® Acousti-Mat 1/4 and Gyp-Crete 2000/3.2K
Jones Hall
Scope: Maxxon® Acousti-Mat 1/4 and Gyp-Crete 2000/3.2K
Maple Grove Hospital
Scope: 44,000 sq. ft. of Maxxon® Gyp-Crete® High Performance was used to increase floor height
Mill Place Office Building
Scope: Maxxon® Gyp-Crete 2000/3.2K and Moistop
Minneapolis Police Department
Scope: Maxxon® Level-Right was used to level floors
Northrop Auditorium
Scope: 8,100 sq. ft. of Level-Right poured at a depth of 1/2”
Residential Home
Schmidt Brewery
Scope: Former brewery renovated into multifamily artist lofts using Maxxon® Gyp-Crete 2000/3.2K, Acousti-Mat 3/8 Premium, Acousti-Mat 3/4
The Depot
Scope: Former rail depot was renovated into two hotels, meeting space, and an indoor skating rink with the help of Maxxon® Gyp-Crete 2000/3.2K
Therma Floor Home
United States Post Office
Scope: Floor leveling using Maxxon® Gyp-Crete® High Performance
Westin Hotel
Scope: Maxxon® Acousti-Mat 3/8 and Gyp-Crete 2000/3.2K